Water Treatment Plant Design-Build

City of Crystal City, Missouri

This project is one of the first of its kind for municipalities in Missouri.

Overview

Horner & Shifrin provided engineering design services as part of a design-build team. This project is one of the first of its kind for municipalities in Missouri. The new 750,000-gallon per day plant replaces the original 55 year-old “Woodrow O. Smith” facility. The new water treatment plant presented numerous design challenges, including finding a suitable location to build the new plant above the 500 year floodplain. Through technological advances, the City now has improved potable water production through a more efficient process, which is critical for long-term sustainability.

Details

Market

Government

Site Size

1.2 MGD

Location

City of Crystal City, Missouri

Year Completed

2016