Overview
Horner & Shifrin provided the Civil/Site design for a new Element by Westin, including parking layout, stormwater management, stormwater detention, water quality design, storm and sanitary sewer design, site utility routing, and ADA accessible pedestrian routes. Project management by H&S included coordination with the architect, MEP and structural engineers, developer, Marriott, and contractor during design. Additionally H&S coordinated with outside agencies such as the Metropolitan St. Louis Sewer District (MSD), the City of St. Louis Streets and Water Departments, and the St. Louis Fire Department for project requirements and permitting submittals. H&S’s coordination with MSD allowed the owner to apply for a $234,000 grant to cover the costs of surveying, engineering, geotechnical investigation, and construction of stormwater volume reductions measures.