Overview
This project included replacement of the deck, new sidewalk and barriers, substructure repairs and bearing replacements. One bent was made integral and the other semi-integral to improve corrosion resistance. Minimal girder repairs and painting were also included. An adjacent gabion wall was repaired. Project included structural and roadway plans as well as construction inspection services.