Overview
Horner & Shifrin Construction Services performed the following Construction Administration services for Lindy Boulevard Bridge Rehabilitation:
Total surface Hydro Demolition and Monolithic Beam Repair, Approach Concrete Repair, Shear Key Repair, use of Rapid Set Concrete patching material – Vertical and Overhead repairs and the use of Steel Fiber Reinforced Concrete Wearing Surface.