Overview
Horner & Shifrin provided Civil, Structural, Mechanical, Electrical, Plumbing, and Fire Protection Engineering and Surveying for demolition of the existing 2,200 square foot fire station and construction of a new 10,000 square foot station adjacent to the Kennett Airport.
Topographic survey included utility locations along Airport Road and the MoDOT Right-of-Way for First Street. Civil Engineering included replacement of parking area, new drive entrance from Airport Road for truck turning, and new 60 foot wide entrance onto the four-lane First Street to avoid firetrucks stopping in busy roadway. The team provided utility coordination through City utilities. Provisions were made for an adjacent helicopter landing pad because of the adjacency to the Kennett Airport.