Overview
As a subconsultant, Horner & Shifrin verified existing topographic survey using eBEE fixed wing drone and established multiple control points and site benchmarks on an approximately 50 acre site to be utilized in the construction of all proposed improvements.
Surveyors prepared office calculations and field layout of grading, parking lots (paving and curbs), sanitary and storm sewers, light standards, utilities, sidewalks, synthetic turf baseball/softball fields, dugouts, bullpens, batting cages, synthetic turf/natural grass soccer fields, pickle ball courts, concession stand and pavilion. Horner & Shifrin, Inc. employed the use of a traditional Trimble Robotic Total Station, Trimble R10 GPS and EBEE fixed wing drone to complete this project.