Replacing a 1966 crossing that now carries more than 51,000 vehicles a day between Illinois and Missouri

Overview

In 1975, the forecast for the Chain of Rocks Bridge was 19,800 vehicles a day. By the time the bridge turned 60, more than 51,000 were crossing it. The I-270 Mississippi River Bridge, built in 1966, links Madison County, Illinois, with St. Louis, Missouri, across 43 spans and more than 5,400 feet, and the I-270 loop it belongs to connects warehouses, distribution parks, ports, airports, and railyards on both sides of the river. That makes the crossing a commute for some drivers and a freight route for others. It carried two lanes in each direction, with shoulders too narrow for first responders or a disabled vehicle, and crews kept coming back to it for expansion joints, pins and links, structural steel, and the substructure. The question for IDOT and MoDOT was no longer whether to replace it, but how.

Replacing it meant answering to two states at once. Horner & Shifrin was prime design consultant, working for the Illinois Department of Transportation (IDOT) in coordination with the Missouri Department of Transportation (MoDOT), from the first study through final design. The Riverview Drive interchange sits just west of the bridge in Missouri, and a new bridge had to fit the interchange it feeds. We also designed that interchange as a separate project, so we worked on both sides of that connection.

We started by getting the right people in one room. Two state departments and the federal government each had a say in the answer, so a design charrette, a working session, brought decision makers from both departments and the Federal Highway Administration’s (FHWA) national office together. It set the alternatives the study would test and expedited the study. Around it, we completed 13 study components, including a major river hydraulic report, bridge condition report, interchange alternatives analysis, regional traffic modeling, Highway Safety Manual safety study, and crash report.

Environmental review ran in parallel under the National Environmental Policy Act, along with U.S. Army Corps of Engineers permitting for work in and over the river (Sections 404, 10, and 408). A Community Advisory Group and public meetings put local voices into the choice of alternative. On July 11, 2018, FHWA approved one categorical exclusion, a federal finding that a project needs no full environmental impact statement, and we had finished on schedule and under budget. When construction started, the public updates continued: informational meetings, mailers and brochures, social media pages, and email campaigns on closures and delays.

Then came the design, and each choice answered a problem the 1966 bridge had. We took Units 1 and 2, 1,966 feet of each bridge, and our teaming partners designed the rest. Unit 1 is dual 383-foot, three-span steel plate girder bridges, each with four 12-foot lanes, a 10-foot inside shoulder, and a 6-foot outside shoulder, which gives first responders and disabled vehicles room the old bridge could not. Unit 2 carries the traffic over the river: dual 1,583-foot, seven-span bridges with spans as long as 236 feet, on drilled shaft piers socketed into bedrock. Where the Riverview Drive ramps leave the mainline, the girders flare so the exit and entrance lanes continue onto the bridge. The bridge is a critical structure, so we designed it for Seismic Performance Zone 2.

Construction began September 23, 2022. The eastbound bridge has carried traffic since late 2024, and on November 9, 2026, IDOT and MoDOT cut the ribbon on the twin bridges. The bridges cost $496.2 million, shared by Illinois and Missouri, and together use 74,000 cubic yards of concrete and 22.6 million pounds of rebar across 10,912 feet of deck. Each direction opens with two lanes and goes to three in 2027, adding capacity for a crossing that now carries more than 2.5 times its 1975 forecast. For the Metro East and St. Louis, that means a river crossing sized for the traffic it carries and a freight loop that no longer depends on a 1966 structure.

Market

Government

Site Size

5,450-ft long dual structures

Location

Madison County, Illinois

Year Completed

2026